Terzaghi’s Consolidation Equation – Finite Difference Solution

Terzaghi’s Consolidation Equation – Finite Difference Solution

 

Terzaghi’s one-dimensional consolidation equation simulates the visco-elastic behaviour of soils depending on the loads applied as it happens, for example, when foundation are laid and start carrying the weight of the structure.

Its application is traditionally based on Taylor’s solution that approximates experimental results by introducing non-theoretical variables that, however, contradict the actual behaviou of soils. After careful examination of the theoretical and experimental aspects connected with consolidation, the proposal of this research is a solution consisting in a non-linear equation that can be considered correct as it meets both mathematical and experimental requirements.

The solution proposed is extended to include differential equations relating to two/three dimensional consolidation by adopting a transversally isotropic model more consistent with the inner structure of soils.

Finally, this essay is complete with application examples that give more reliable results than the traditional solution. Future developments are also highlighted considering that the uniqueness theorem has not been proven yet.

 

Download Link

Design Curved Beam Spreadsheet

Design Curved Beam Spreadsheet

 

Curved Beam is a beam in which the neutral axis in the unloaded condition is curved instead of straight. Or If the beam is originally curved before applying the bending moment.
Curved beams have applications in many machine members such as c – clampers , crane hooks, frames of  presses, chains, links, rings, etc
The main difference between curved beams and straight ones that the Neutral axis does not coincide with the cross section, but is shifted towards the center of curvature of the beam.
This spreadsheet will help you to design easily curved beams

Download Link

Design of Precast Prestressed Composite Beams Excel Sheet

Design of Precast Prestressed Composite Beams Excel Sheet

 

The precast prestressed concrete units are erected first and can be used to support the formwork needed for the cast in situ slab without additional scaffolding (or shoring).

In addition to its contribution to the strength and stiffness of the composite member, the cast in situ slab provides an effective means to distribute loads in the lateral direction.

The cast in situ slab can be poured continuously over the supports of precast units placed in series, thus providing continuity to a simple span system.Pre-tensioning in plant is more cost-effective than post-tensioning on site.

Because the precast 4 prestressed concrete element is factory-produced and contains the bulk of reinforcement, rigorous quality control and higher mechanical properties can be achieved at relatively low cost. The cast in situ concrete slab does not need to have high mechanical properties and thus is suitable to field conditions.

 

Download Link

Supermarket project– multibodegas

Supermarket project – multibodegas

 

Project Name: Supermarket project– multibodegas

Description: The content is building a Maxibodega has architecture; cuts; elevation; plane structures, section beams, slab lightened; columns section and distribution; details miscellaneous metal frame plane with respective joists and details armed

Category: Autocad Drawing / Projects / Store houses – ware houses

File extension: DWG

Download Link

Recreation center tour

Recreation center tour

Project Name: Recreation center tour

Description: Recreation Center Tour – Project – Plants – cuts

Category: Autocad Drawing / Projects / Tourism – recreation

File extension: DWG

 

Download Link

Beam Analysis Excel Spreadsheet

Beam Analysis Excel Spreadsheet

 

Shear Force, calculates flexible moment and deficit in 31 locations along the length of member “Embalal”. Members’ length can only be supported with single size or medium support, which is supported by 2, 3 or 4 lengths. The results of the analysis are produced in a tabular form and are imprinted in 3 graphs for quick understanding.
The program uses a common equation for the default equation with Shear Force, Bending Moment, and Member Time. When the middle support is specified, the solution setup is set up and the middle support response account is set up.

Spreadsheet Download

The program works internally consistent force and length unit. Permitted use of mixed units to help refine the results. The pregnancy and elastic modules of the member’s section can be defined in any unit. Similarly, any desired unit can set the reflection value. To make the unit specific, go to unit sheets and describe the ball, distance, intensity, modulus and deficit units. You need to calculate and count the conversion elements of the centralized unit from the selected unit. Sample Value This sheet is provided for your guidance. Units can not be mixed in one project file. All beams of the selected unit file apply. This means that if the units change between the formation of data files, then bees must be redefined bee characteristics in conjunction with selected bees.

Download Link

 

error: Content is protected !!
Exit mobile version