Pile Group Analysis For Rigid Pile Cap Spreadsheet

Pile Group Analysis For Rigid Pile Cap Spreadsheet

 

“Pile Group Analysis For Rigid Pile Cap” is a spreadsheet program written in MS-Excel for the purpose of analysis of pile groups with rigid caps using the “elastic method”.

Specifically, the properties of the pile group are calculated, and then based upon the applied vertical and horizontal loadings, the vertical and horizontal pile reactions are calculated.

There is also a worksheet to check beam and punching shear in the pile cap for a single corner pile, for the purpose of estimating the required pile cap thickness and subsequent pile cap weight.

This workbook has some concrete design in them, based on the ACI 318-99 Code in their original form.  To reflect the use of the ACI 318-05, I decided to give the user the option of selecting what ACI Code is desired to be used, 318-99, 318-02, or 318-05, in those specific worksheets.

Once the user selects the desired ACI Code, the appropriate “phi” factors are displayed and used.  One word of caution, be careful not to mix & match “phi” factors and load factors from the various concrete codes.  It’s obviously up to the user to be consistent.

For the purpose of just what specific concrete analysis and design is done in this workbook, the selection of either ACI 318-02 or 318-05 gives the same results.

This program is a workbook consisting of ten (10) worksheets, described as follows:

  • Doc – Documentation sheet
  • Piles (<=25) – Pile group analysis for up to 25 total piles and 4 piers/loadings
  • Piles (<=25)(metric) – Pile group analysis for up to 25 total piles and 4 piers/loadings (metric)
  • Piles (<=75) – Pile group analysis for up to 75 total piles and 8 piers/loadings
  • Piles (<=75)(metric) – Pile group analysis for up to 75 total piles and 8 piers/loadings (metric)
  • Piles (<=300) – Pile group analysis for up to 300 total piles and 17 piers/loadings
  • Piles (<=300)(metric) – Pile group analysis for up to 300 total piles and 17 piers/loadings (metric)
  • Piles (<=400) – Pile group analysis for up to 400 total piles and 23 piers/loadings
  • Piles (<=400)(metric) – Pile group analysis for up to 400 total piles and 23 piers/loadings (metric)
  • Corner Pile Shear – Beam and punching shear checks for pile cap for single corner pile

Program Assumptions and Limitations:

1.  The Pile Group worksheets assume a minimum of 2 piles and a maximum of either 25, 75, 300, or 400 piles for a pile group.

2.  This program uses the “elastic method” of analysis, assuming that the pile cap is in fact “rigid”, so that the applied loads are linearly distributed among the piles.  A common “rule-of-thumb” is to assume a pile cap thickness equal to least 1/10 of the longest dimension (length or width) of the pile cap.  All piles are assumed to be vertical, and of equal size and length (stiffness).  Battered piles are NOT permitted.  The tops of all piles are assumed at the same level.

3.  This program assumes an orthogonal X-Y-Z coordinate system.  All piles and piers MUST BE located in the “positive” (1st) quadrant.  “Negative” pile or pier/loading location coordinates are NOT permitted. “Right-Hand-Rule” sign convention is used for all applied forces and moments at pier locations.

4.  The piles and piers/loadings can be numbered in any desired order.  However, the user should make sure to either clear the contents of all spreadsheet cells that are not used for input or those cell values should be input = 0.  All piles and piers/loadings MUST BE input in proper numerical sequence with no “breaks” in the numerical order of input data.

5.  This program does NOT include the weight of the pile cap or piers in the calculation of the vertical pile reactions. However, the total weight of the pile cap and piers may be included by assuming an additional “ficticious” pier located at the centroid of the pile cap plan area, and applying the total weight at that “pier” location.

6.  This program does NOT check the actual calculated pile reactions (vertical and horizontal) against known or given allowable pile reactions for downward, uplift, or lateral cases.  This is done so that the extent of any acceptable overstress is left up to the judgement of the user.  However, in all cases this must be checked by the user.

7.  This program does NOT perform all of the necessary checks for the beam-type shear or punching shear for the pile cap, as this must be done independently by the user.  However the “Corner Pile Shear” worksheet can be used to estimate the required pile cap thickness and subsequently the pile cap weight to be accounted for.

8.  This program does NOT check the flexural requirements of the pile cap, as this must be done independently by the user.

9.  This program contains numerous “comment boxes” which contain a wide variety of information including explanations of input or output items, equations used, data tables, etc.  (Note:  presence of a “comment box” is denoted by a “red triangle” in the upper right-hand corner of a cell.  Merely move the mouse pointer to the desired cell to view the contents of that particular “comment box”.)

Calculation Reference
ACI Manual

 

Download Link

MS Project 2019 Advanced Tutorial

MS Project 2019 Advanced Tutorial

 

  • Start 0:00
  • Introduction 0:03
  • Introduction to Tracking Actuals 2:21
  • Marking Tasks Complete 4:03
  • Introduction to Tracking Tables 6:57
  • Creating Custom Tables 9:36
  • Moving Projects and Updating Actual Duration 14:04
  • Filtering, Highlighting, Grouping, and Updating Resource Info 19:17
  • Project Statistics 26:08
  • Resource Reports 30:12
  • Cost Reports 33:49
  • In Progress Reports 46:24
  • Dashboards 50:33
  • Custom Reports 55:35
  • Customizing Task Boards View and Managing Sprints 1:01:37
  • Task Boards Reports 1:08:25
  • Visual Reports 1:11:46
  • Customizing Visual Reports 1:15:53
  • Introduction to Administration 1:21:18
  • Getting Started Tutorials and Report 1:22:50
  • Basic Administration 1:25:31
  • Using the Organizer to Save Custom Objects 1:30:35
  • Creating Templates 1:35:46
  • Creating New Files from Excel Workbooks 1:41:09
  • Creating New Files from SharePoint Task Lists 1:46:33
  • Advanced Administration 1:48:00
  • Creating a Consolidated Project 1:51:42
  • Sharing Resources with a Resource Pool 2:00:46
  • Exporting Data to Other Data Sources 2:07:39
  • Conclusion 2:09:41

 

Download Link

error: Content is protected !!
Exit mobile version