Object Information in AutoCAD 2020 Webinar

Object Information in AutoCAD 2020 Webinar

 

This webcast will teach those new to the AutoCAD software how to obtain important information about objects in AutoCAD 2020. In this webcast, learn how to:

* Use Quick Properties and Properties to obtain object information.
* Modify the properties of objects and also match the properties of two different objects.
* Obtain exact measurements of the objects using the measuring tools.

The content from this webcast is taken from Chapter 9 (Analyzing Model and Object Properties) of the ASCENT Learning Guide, AutoCAD 2020 Fundamentals.

Details

Title Object Information in AutoCAD 2020
Duration 49 Mins
Language English
Format MP4
Size 109 MB

 

Download Link

Bridge Expansion Joints Presentation

Bridge Expansion Joints Presentation

 

Why do we need joints?

  • Bridge deck joints allow a bridge to expand and contract due to a number of factors such as: temperature changes, deflections caused by live loads, creep and shrinkage of concrete etc.
  • Bridge deck joints are a necessary component of a properly designed and functioning structure.

Content:

  • FACTORS EFFECTING THE SELECTION OF DECK JOINT
  • SELECTION OF DECK JOINT TYPE
  • RECOMMENDATIONS FOR SELECTION OF DECK JOINT TYPE

Download Link

Bridge Live Load Distribution Powerpoint Presentation

Bridge Live Load Distribution Powerpoint Presentation

 

Live load distribution on highway bridges is a key response quantity in determining member size and, consequently, strength and serviceability. It is of critical importance both in the design of new bridges and in the evaluation of the load carrying capacity of existing bridges.

Live load distribution is a function of the magnitude and location of truck live loads and the response of the bridge to these loads.

 

Download Link

Millau, the highest bridge in the world Presentation

Millau, the highest bridge in the world Presentation

 

The construction of the Millau viaduct in the southeast of France was a colossal engineering effort. The piers rise 803 feet from ground level, and the bridge weighs 400,000 tons.

The bridge is supported by seven huge pillars. When the thickness of the platform (14 feet) and the height of the pillars are included, the total height reaches 1102 feet. That is about 50 feet higher than the famous Eiffel Tower.

Construction of this bridge required more than 350,000 tons of concrete and 40,000 tons of steel. Assembled with the precision of a Swiss watch, this giant was designed to resist winds of up to 130 miles per hour and has cost almost 300 million euros (US$523 million).

Built across the mountainous terrain of the Tarn river valley, the 8071-foot long bridge is part of the A-75 freeway that connects the cities of Clermont-Ferrand and Béziers. It will shorten by more than 60 miles the route connecting Paris with the Mediterranean.

Seven European countries participated in construction of the bridge, the design of which was the work of the prestigious British architect, Sir Norman Foster, of Manchester, England.

Download Link

error: Content is protected !!